Great Loop bridge planning reference

Atlantic Beach Bridge

Atlantic Beach Bridge on Atlantic ICW / Bogue Soundnear Morehead City / Atlantic Beach, NC; closed clearance about 65 ft. Standard fixed ICW clearance.

Planning awareness only: Bridge information is provided for planning awareness only. Always verify current bridge status, clearance, water levels, bridge schedules, opening restrictions, Local Notices to Mariners, bridge signage, and official charts before transit. FloatPlanWizard is not a navigation authority.

34.70370000, -76.73870000

Planning only Fixed bridgeAir draft concern
WaterwayAtlantic ICW / Bogue Sound
Route SegmentAtlantic ICW
Route VariantMain ICW
State / ProvinceNC
Nearest CityMorehead City / Atlantic Beach
Mile MarkerMM 206.7
Bridge TypeFixed
Source Confidencemedium

Clearance And Opening Details

Vertical Clearance Closed65.00 ft
Vertical Clearance OpenNot verified
Horizontal ClearanceNot verified
VHF ChannelNot verified
PhoneNot verified
Last Verified2026-06-08
Verify against current water level / bridge gauge before transit.

Planning Notes

Air Draft Notes
Closed/air-draft clearance: 65 ft. Datum/reference: WG Atlantic ICW summary. Clearance band: Standard ICW 65 ft
Opening Schedule
Fixed.
Operator / Contact
Not verified
Navigation Notes
Fixed. WG notes clearance may be closer to 63 ft. Closed/air-draft clearance: 65 ft. Datum/reference: WG Atlantic ICW summary. Clearance band: Standard ICW 65 ft Fixed.
Regulatory Notes
Fixed. WG notes clearance may be closer to 63 ft.