28.05950000, -82.80320000
Planning only
Drawbridge / movable Air draft concern
WaterwayGIWW / St. Joseph Sound
Route SegmentFlorida Gulf Coast
Route VariantGulf ICW / west Florida
State / ProvinceFL
Nearest CityDunedin
Mile MarkerDunedin
Bridge TypeBascule
Source Confidencemedium
Clearance And Opening Details
Vertical Clearance Closed24.00 ft
Vertical Clearance OpenNot verified
Horizontal ClearanceNot verified
VHF Channel9
PhoneNot verified
Last Verified2026-06-08
Verify against current water level / bridge gauge before transit.
Planning Notes
- Air Draft Notes
- Closed/air-draft clearance: 24 ft. Datum/reference: Waterway Guide Gulf Coast summary. Clearance band: Low / Timing-sensitive
- Opening Schedule
- Monitor VHF 09; verify schedule.
- Operator / Contact
- Not verified
- Navigation Notes
- Monitor VHF 09; verify schedule. Important timing bridge on north Pinellas transit. Closed/air-draft clearance: 24 ft. Datum/reference: Waterway Guide Gulf Coast summary. Clearance band: Low / Timing-sensitive Monitor VHF 09; verify schedule.
- Regulatory Notes
- Monitor VHF 09; verify schedule. Important timing bridge on north Pinellas transit.