41.65300000, -87.56100000
Planning only
Drawbridge / movable Railroad bridgeAir draft concern
WaterwayCalumet River
Route SegmentIllinois / Chicago
Route VariantInland Rivers / Chicago or Cal-Sag
State / ProvinceIL
Nearest CityChicago
Mile MarkerRM 327.7
Bridge TypeLift railroad
Source Confidencemedium
Clearance And Opening Details
Vertical Clearance Closed22.50 ft
Vertical Clearance Open125.00 ft
Horizontal Clearance219.70 ft
VHF ChannelNot verified
PhoneNot verified
Last Verified2026-06-08
Bridge contact information has not been verified yet. Confirm current opening procedures before transit.
Verify against current water level / bridge gauge before transit.
Planning Notes
- Air Draft Notes
- Closed/air-draft clearance: 22.5 ft. Open clearance: 125 ft. Datum/reference: Low Water Datum Lake Michigan; IGLD 1985. Clearance band: Low / Timing-sensitive
- Opening Schedule
- Lift bridge; verify rail/opening status.
- Operator / Contact
- Not verified
- Navigation Notes
- Lift bridge; verify rail/opening status. Closed clearance low; open clearance high. Closed/air-draft clearance: 22.5 ft. Open clearance: 125 ft. Datum/reference: Low Water Datum Lake Michigan; IGLD 1985. Clearance band: Low / Timing-sensitive Lift bridge; verify rail/opening status.
- Regulatory Notes
- Lift bridge; verify rail/opening status. Closed clearance low; open clearance high.