Great Loop bridge planning reference

Peoria and Pekin Union Railroad Drawbridge

Peoria and Pekin Union Railroad Drawbridge on Illinois Rivernear Peoria, IL; closed clearance about 19.8 ft. Critical low movable rail bridge.

40.67100000, -89.60400000

Drawbridge / movable Railroad bridge
WaterwayIllinois River
Route SegmentIllinois / Chicago
Route VariantInland Rivers / Chicago or Cal-Sag
State / ProvinceIL
Nearest CityPeoria
Mile MarkerRM 160.6
Bridge TypeLift railroad
Source Confidencemedium

What Boaters Should Know

Peoria and Pekin Union Railroad Drawbridge on Illinois Rivernear Peoria, IL; closed clearance about 19.8 ft. Critical low movable rail bridge.

Clearance And Opening Details

Vertical Clearance Closed19.80 ft
Vertical Clearance Open63.70 ft
Horizontal Clearance307.00 ft
VHF ChannelNot verified
PhoneNot verified
Last Verified2026-06-08
Bridge contact information has not been verified yet. Confirm current opening procedures before transit.
Verify against current water level / bridge gauge before transit.

Opening / Contact Notes

Opening Schedule
Lift bridge; verify status.
Operator / Contact
Not verified

Navigation And Regulatory Notes

Air Draft Notes
Closed/air-draft clearance: 19.8 ft. Open clearance: 63.7 ft. Datum/reference: Low Operating Level / Flat Pool; NGVD 1929. Clearance band: Route-limiting / Critical
Navigation Notes
Lift bridge; verify status. Closed clearance is near Great Loop control point; verify open status/communications. Closed/air-draft clearance: 19.8 ft. Open clearance: 63.7 ft. Datum/reference: Low Operating Level / Flat Pool; NGVD 1929. Clearance band: Route-limiting / Critical Lift bridge; verify status.
Regulatory Notes
Lift bridge; verify status. Closed clearance is near Great Loop control point; verify open status/communications.

Planning Considerations

Confirm your vessel air draft, current water levels, bridge signage, official charts, bridge schedules, Local Notices to Mariners, and any VHF or phone procedures before approaching this bridge. If the bridge is movable, build extra time into your route plan for opening windows, traffic, restrictions, weather, and communication delays.

Planning awareness only: Bridge information is provided for planning awareness only. Always verify current bridge status, clearance, water levels, bridge schedules, opening restrictions, Local Notices to Mariners, bridge signage, and official charts before transit. FloatPlanWizard is not a navigation authority.